H
-=HaZ=-
Hey guys, been working on a job plastering and they have asked me to put the bathroom suite in, when taking the old one out it was all lead so iv cut back on it all to the wall and will install new waste for the sink and bath
My issue is the toilet isn't in the same position but its about 4ft away so I might have to drill straight through the wall....
Either way iv got to connect to lead pipework, either on the outside of the building into the drain work that's there now or through the old waste
What is the best way to connect to lead and what fittings would i need? Also the pipework is needed for the toilet, so it will be approx 110mm
Thanks
My issue is the toilet isn't in the same position but its about 4ft away so I might have to drill straight through the wall....
Either way iv got to connect to lead pipework, either on the outside of the building into the drain work that's there now or through the old waste
What is the best way to connect to lead and what fittings would i need? Also the pipework is needed for the toilet, so it will be approx 110mm
Thanks