Only just recently had a Brit Gas bod here for two days, re-plumbing the airing cupboard, rodding out some pipes, replacing some plastic with copper, loads of upstairs floorboards up, fitted a filter and treated the system. It was he who recommended replacing the rads one by one as and when. This is the first one I’m changing. Yes it’s open vented but I’m wary of messing with the system too much now that he’s got all rads working again. I know I could tie up the ball valve in the loft, drain it all down and then add inhibitor before releasing the ball valve again but as I say, I’m wary of messing with it. I’m happy with the old valves at this stage. I could always change them all in one go at some time in the future.

Thanks for the suggestions though :)
If that’s your thought then look at bunging the f&e tank. Then you’ll be able to remove the valves one at a time as you replace the rads
 
Thanks for the suggestion. I’ll give it a try next time :)
I don't see the problem. As you're happy to keep the valves, you can isolate the rad so you don't need to drain the system. Obvs a radful will come out, catch as much as much as you can, to minimise mess and so you can return it to the F/E tank (after settling out any sludge). Unscrew and re-use the rad tails with your new spanner. If the new rad is the same length, you should be able to screw the tails in so the overall length is the same, but there's likely to be a few mm play in the pipes anyway. If to get the right length you need to stop before the tail is dead tight you might be better off with PTFE tape (plenty of it) rather than paste, but the pros here might correct me on that.
 
I’ve only just realised that I rudely never updated this thread.

Using my shiny new radiator spanner I was able to swap the tails from the old rad to the new, connect up with a sliding extender on one end and the job was a good ‘un. Thanks for the help guys :)
 

Reply to Connect old rad valves to new rad in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi Everyone I wasn’t sure whether to post this in here or UFH but hopefully I’m posting this in the correct group. I’m in the throes of a full renovation and am currently designing the central heating system, I’m installing radiators (11 or 12 in total) and am going to run each rad from its...
Replies
7
Views
734
Hello, We had an extension built seven years ago. Initially the builders' plumber connected the heating to the house system but this didn't work. The builder got him out again and he created a separate heating circuit from the boiler (ie one circuit for the house, the other for the extension)...
Replies
23
Views
723
Morning all. I hope this is the correct place for this post. If not i'll happily move it to another forum area. I am renovating a property and the old cast iron radiators need a refresh, and i'm going to fit some new bleed valves amongst other things. The female thread in most of the rads...
Replies
4
Views
629
Hi I seek some advice on replacing an existing regular boiler. I currently have an old Potterton 10-16 Netaheat electronic, which is around 35 years old and still working OK. It is fitted to a std 'Y' plan system with boiler in utility room and separate hot water tank, pump, valve etc in...
Replies
7
Views
639
I have tried hard to get similar to the first class satchwqell /Sunvic SML type revolving type valves instead of the quite short lived spring return type valves. I saw an advert from the Hearken company who either make these or buy them in. The only problem they are BSP threads so adaptors are...
Replies
0
Views
353
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock