Hello
I've laid wet UFH in the new extension (suspended floor) as follows:
1) 3 loops (about 80m each) in the zone.
2) 2 port valves for 3 zones on the flows (UFH, upstairs rads, downstairs rads).
The pressure test indicates no leaks in any of the loops.
When the valve to the UFH is closed...