Hello everyone
I have recently converted my sisters old open vented semi gravity central heating system to a sealed fully pumped Yplan with Vaillant ecotec system boiler. I was full of enthusiasm for this project before i started. The installation of the boiler and re-arranging the pipework all went very smoothly. Now i am at the wiring of the system heating controls stage things are a very different story, I’m no longer enthusiastic and am actually starting to lose the will to live. My aim is to get the whole system installed except the gas pipe and mains electricity connection which will be done by a corgi/part P man before he commissions it. I believe this should be easily achievable if someone could kindly guide me in the right direction. I have looked at many wiring diagrams online but none with a wiring centre and a system boiler.......Its now time to admit defeat and ask you guys for your help. Below i have tried to paint you as bigger picture as i can without over complicating things. Take a look............

The Components
1 Vaillant ecotec 618 system boiler
2 Honeywell Sundial plan wiring centre 42005748-001
3 Honeywell ST6400c Programmer
4 Honeywell V4073A Mid-Position valve
5 Honeywell L641A Cylinder Stat
6 Honeywell Room Stat (Unknown) Its the dial type, brown and beige installed in the mid 80’s, has 4 wires red to 1 blue to 2 yellow to3 Earth is left loose. Previously wired to a Randall time clock on a pumped heating gravity hot water system.
.All the above components are new with the exception of the existing room stat
The Plan
To wire all the above components for a Y plan configuration fully pumped system boiler.
What I have done so far. . .
1 Replaced old boiler with the Vaillant ecotec, arranged pipe work and fitted the mid-position valve.
2 Screwed wiring centre into the wall in the vicinity of the Switched fused mains, boiler and mid-position valve ( all in same compartment)
3 Run the heat resisting twin and earth cable from cylinder stat to wiring centre (not connected)
4 Run the wiring for programmer. Five wires are needed for a Yplan configuration [NL1 34]. I have run 2x Twin and earth, is this acceptable? (not connected)
5 I have an existing wire connected at the room stat. Red-1, blue-2, yellow-3, loose earth run to wiring centre (not connected)
6 I have wired the mid-position valve to the wiring centres mid-position block as this was relatively easy.The terminal block accommodates a brown wire which I don’t have on the mid-position valve. Should I be concerned?
I’m confused
The wiring centre gives wiring instructions for pump overrun boilers and basic boilers, pump overrun requiring 5 wires and basic requiring 3.The vaillant ecotec being a pump overrun. The boiler installation manual gives instruction for a 3 core flexible cord only. Although the boiler does have 3 more terminals for " EXTERNAL ELECTRICAL CONTROLS . . . The boiler terminals 3,4 and 5 are for connecting external electrical controls such as a time switch and/or room thermostat. Terminals 3 and 4 are linked when the boiler is supplied. If external controls are used, this link must be removed, and the controls connected across terminals 3 and 4. Terminal 5 is an additional neutral connection for external neutrals such as from the anticipator of a room stat. If a room thermostat is to be connected in addition to a time switch the wire between the time switch ON terminal and boiler terminal 4 should be broken by the contacts of the room thermostat" I don’t know how relevant that is?? The boiler manual also says "CIRCULATING PUMP. . . The boiler incorporates a built in circulating pump that is fully prewired (no additional wiring necessary). The pump incorporates an automatic overrun period after the boiler switches off". What would i do with the wiring centres pump block?The boiler manual gives no info for wiring via a wiring centre.
I suppose, in a nutshell, my question is. . apart from what i have done so far ( which isn’t a lot) How do i do the rest? Which colour wire goes to which terminal number, do i need to make bridges anywhere, do i need to remove or cut links etc. I’m aware i need to cut links 1,4,5 and 6 in the wiring centre.
I know this is a big ask and i am fully aware that information on these pages comes from the goodness of people’s hearts so in advance i would like to give a massive thanks to anyone giving advice. . . it really is appreciated..........THANKS.
 
gee, its difficult with so much info, a couple of points, you cannot use a earth for anything but an earth, pump overun needs permanent live. follow instructions to the letter
 
sorry fuzzy you can use the earth wire for something other than an earth if you use the correct sheathing IE: brown for live and blue neutral.

Flying lee it looks like your trying to save money but the work you are doing will have to be checked by the person signing off the work, it can take longer checking and testing someones work than installing it and if there is a mistake it may cost you a lot more than paying for it doing right in the first place.
 
Status
Not open for further replies.

Reply to YPlan wiring help needed in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi All I have a leak coming from within my Mira Elite QT shower. It seems to be flowing from behind the switching Control. Any ideas what could be causing this leak. Already Changed the Pump Elbow as one of the clips had popped which was causing a second small leak, Any idea? Is it time to buy...
Replies
0
Views
202
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
249
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock