Search the forum,

Discuss Y-plan to sealed system(combi) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
F

fabio

Hey guys.Converting a y-plan to a sealed system in the airing cuboard where the cylinder is.Once i have removed everything is it just the c/h flow and return from the cylinder coil that i join together and capp all the other pipes? cheers guys
 
Do you mean you are converting a open vented cylinder,tank and boiler to a combination boiler system ?

you can have a y-plan on all types of systems
 
Sorry i didnt make that very clear.Yes Puddle,thats what i ment.Cheers
 
remove 3 port valve,connect flow from boiler into valve to heating flow from valve,remove cylinder and cap off return from cylinder,existing flow and returns from old boiler become heating flow and return,obviously cold feed and vent to be removed/capped if any connect near boiler
 
Last edited by a moderator:
Status
Not open for further replies.

Reply to Y-plan to sealed system(combi) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi, basic question, any insight much appreciated. Looking to have an outdoor tap in my front porch fed from 15mm pex coming up from suspended floor. Pic 1 is inside porch, pex temporarily clipped to give an idea of pipe placement (ignore shoddy blockwork of booted cowboy builder!), Pic 2 is...
Replies
6
Views
203
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock