R
Rodders111
Hi all. Newbie here with a quick question.
I am just about to replace my old lead rising main with a new 25mm Mdpe one.
I plan to take this off the street straight into my attached garage, then up into to front box bedroom, along the landing, into the bathroom and then down into the kitchen.
After the stop tap, should I be using 15mm straight away or should I try to keep it at 22mm for as long as I can?
I am just about to replace my old lead rising main with a new 25mm Mdpe one.
I plan to take this off the street straight into my attached garage, then up into to front box bedroom, along the landing, into the bathroom and then down into the kitchen.
After the stop tap, should I be using 15mm straight away or should I try to keep it at 22mm for as long as I can?