Just looking for some input on the best method of installing a new WC on the ground floor, I hope the picture explains what is required.
The old WC is being removed and the new one needs to be connected to the soil pipe, not sure if an inspection chamber is necessary or if it can be connected to the existing soil pipe (which will not be straight forward due to the angle. I would be putting an AAV on the sub stack to avoid siphonage.