Hi, My plumber is very ill, and is inordinately slow. As Im scared for his health, I have stopped him working for me .
I have to do:
Join 2 Telford Tempests (I have all the parts), to a Low loss header.
Commission the Boilers (Pipework is ready to meter) (2 Keston C40's):
I need 4 flue pipes to outside left required.
Need of course the Gas Safety Certificate at end.
I think its about 3 days work.
Please help me I Dont want to be in the house during Christmas without heating, its already freezing.
I have to do:
Join 2 Telford Tempests (I have all the parts), to a Low loss header.
Commission the Boilers (Pipework is ready to meter) (2 Keston C40's):
I need 4 flue pipes to outside left required.
Need of course the Gas Safety Certificate at end.
I think its about 3 days work.
Please help me I Dont want to be in the house during Christmas without heating, its already freezing.