Quote:
Originally Posted by stevetheplumber
personally i think drain laying standards are crap these days especially on new builds 6 metre lengths of plastic wind up like bannanas after a couple of days laying arond on site no real leveling is done as long as its down hill it will do
durgos all over the place so little air flow thru when you lift the cover they stink even when theres no blockages
we had probably the worlds best sewage system in this country now its just diy quality in most places
its all in the name of cheap even the sanitary inspectors that come round from the council know little a bout the subject
|
Sanitary inspectors, whats them, now a-days, its a university kid all book learning and no practical, called a building inspector, you can run rings around them, one of them had the cheek to tell me he could not pass, float comprising of a wash hand basin then a couple of kitchen sinks, the anti siphon was in 11/4" copper, same as the basin waste, which jumped up to 11/2" copper for the sink wastes, he wanted me to run the anti in 11/2"copper, he had to go and check his little book when I said that I could start the anti siphon from the basin in 1" copper, then he moaned even more because he saw a drip of water on an access door on the C I soil stack, at the foot of the stack, the pans on the first floor were full to the brim with water, and I had a good 10' head of water behind the door, don't know why but he didn't seem to appreciate me reading him the rules to him