Plumbing Forum - Plumbers Forums - Plumbing Courses - Plumbing Training - Plumbing Advice

Go Back   Plumbing Forum | Plumbers Forums | A forum for plumbers in the UK > Plumbing Forums > Plumbing Forum
Forgot Password? Join Us!

Plumbing Forum General plumbing questions answered in our plumbing forum. Please use this forum for plumbing related topics.

Reply
 
LinkBack Thread Tools Display Modes
Old 10-07-2008   #1 (permalink)
coolwaterpaul
Junior Member
 
Join Date: Jun 2008
Posts: 10
View coolwaterpaul's Photo Album
Default Removal of Radiator

Could you help me, a friend of mine has asked me to remove a radiator completely, from the front room and he would like the 2 pipes which are vertical which were attached to the radiator to be hidden below the concrete.
Could i cap off both pipes or would i have to connect both pipes together to continue the flow? ?
Could you help?

What would you advise?

Many thanks.

coolwaterpaul...

coolwaterpaul is offline   Reply With Quote
Old 10-07-2008   #2 (permalink)
Paultheplumber
Junior Member
 
Join Date: Jun 2008
Location: Manchester
Posts: 14
View Paultheplumber's Photo Album
Default Re: Removal of Radiator

you could cap them as it is only a branch off the flow and return its better to cap them as close as you can to the pipe they are fed from try lifting the floor boards upstairs and follow the pipes. when you say under the concreate do you mean the plaster on the wall if so you can bury them under that but you may have to take away some of the brick to get the plaster flush with the rest of the wall you should also cover the pipes with anti corrosion tape.
Paultheplumber is offline   Reply With Quote
Old 11-07-2008   #3 (permalink)
coolwaterpaul
Junior Member
 
Join Date: Jun 2008
Posts: 10
View coolwaterpaul's Photo Album
Default Re: Removal of Radiator

Thanks for the reply, so i can cap both pipes seperately flush with the concrete, would i not have to join both pipes together to carry on the flow?
coolwaterpaul is offline   Reply With Quote
Old 11-07-2008   #4 (permalink)
SimonG
Junior Member
 
Join Date: Jul 2008
Posts: 8
View SimonG's Photo Album
Default Re: Removal of Radiator

If the pipes are all in the concrete I normally break out some of the concrete and cut the pipes below the level of the floor, cap it and make good. If you can trace the pipes back to ceiling void you can cut and cap there. But make sure the pipes only feed that 1 radiator.
SimonG is offline   Reply With Quote
Old 12-07-2008   #5 (permalink)
coolwaterpaul
Junior Member
 
Join Date: Jun 2008
Posts: 10
View coolwaterpaul's Photo Album
Default Re: Removal of Radiator

thanks for the reply, how would i check if the pipes only feed that 1 radiator?
coolwaterpaul is offline   Reply With Quote
Old 12-07-2008   #6 (permalink)
SimonG
Junior Member
 
Join Date: Jul 2008
Posts: 8
View SimonG's Photo Album
Default Re: Removal of Radiator

Find the pipes in the ceiling void, close the valves on the rad and then switch on the heating. Check to see if the pipes in the ceiling heat up. Chances are that if all the ground floor pipes are in the concrete then the feed will probably go to more than one rad.
SimonG is offline   Reply With Quote
Old 13-07-2008   #7 (permalink)
coolwaterpaul
Junior Member
 
Join Date: Jun 2008
Posts: 10
View coolwaterpaul's Photo Album
Default Re: Removal of Radiator

Many thanks for the reply, i will join the 2 pipes with a longer piece and connect to carry on the flow, would that be advisable?
coolwaterpaul is offline   Reply With Quote
Old 13-07-2008   #8 (permalink)
SimonG
Junior Member
 
Join Date: Jul 2008
Posts: 8
View SimonG's Photo Album
Default Re: Removal of Radiator

It depends where abouts you are going to connect them. If it's down in the concrete I would just cap off. If it's up in the ceiling you still need to check that they only feed that 1 rad, but again just capping is ok.
SimonG is offline   Reply With Quote
Old 13-07-2008   #9 (permalink)
coolwaterpaul
Junior Member
 
Join Date: Jun 2008
Posts: 10
View coolwaterpaul's Photo Album
Default Re: Removal of Radiator

Cheers again simon G, i have spoken to my mate who i am doing the rad for, i have said to turn the 2 pipes off which are connecting the rad, turn the central heating on, if all the other rads heat up, then that should answer the question! so if all the other rads heat up then i can remove the rad and cap both pipes, is this correct?
Can i use compression fit to cap off both pipes below concrete? any advice?
coolwaterpaul is offline   Reply With Quote
Old 14-07-2008   #10 (permalink)
SimonG
Junior Member
 
Join Date: Jul 2008
Posts: 8
View SimonG's Photo Album
Default Re: Removal of Radiator

Compression is fine.

SimonG is offline   Reply With Quote
Reply

Bookmarks

Tags
None


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Radiator extension piece? dundeenil Central Heating Forum 5 09-10-2008 12:54 PM
Radiator needs bleeding every 3 weeks or so GreenockBoy Central Heating Forum 4 07-10-2008 12:48 AM
One radiator hot when heating off user123 Plumbing Forum 4 20-09-2008 03:15 PM
radiator slagbagger Central Heating Forum 3 12-09-2008 06:14 PM
bad walls + radiator = not good. obseen16 Plumbing Forum 2 11-09-2008 09:02 PM

Google Search
Google

All times are GMT +1. The time now is 02:02 AM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.0.0
(c) 2007 Plumbing Forum - UK Plumbers Forums

COMMUNITY SPONSORS

 Training
Plumbing Courses by Chase Plumbing Academy

Plastering Courses by Diamond Training Centre

Able Skills Plumbing Courses

Construction Skills College Limited

Yorkshire Tiling Academy for Plumbing Courses

North East Tiling Training

Chase Tiling Academy Tiling Courses

North East Plastering Training

Diamond Training Centre for Tiling Courses

Silver Trowel Trade Training

Manufacturers
Drill Tough Tile - Tile Forums Sponsors

Schluter Systems Limited

Perfect Silicone Joints - Supporting the Tile Forum

Suppliers

Quality Wetroom Solutions

Other Sponsors


Traders Liability Insurance - Liability Insurance for Tilers

Find Trusted Tradesmen

Our sponsors keep the forum free to use, please click their banners (above) and use the sponsors when you can. Some offer special rates to forum members too.

Other Links

 

OTHER LINKS

Find a Plumber
Plumbers's Register Here FREE
Trusted Tradesmen



UK Plumbers Forums is the UK's bussiest and friendliest plumbing forum. Checkout our top categories which include the Plumbing Forums, Plumbing Training Courses, Plumbing Tools, Air Conditioning Forum, CORGI Gas Forum, and the Showers and Wetrooms Forum. We have a resident Plumbing Courses training centre and Wetrooms Solutions company. Please also consider registeringing for free on Find a Plumber, Rated Plumbers all on Find Trusted Tradesmen. Thanks for checking out the Plumbing Forums here at UK Plumbers Forums. Plumbing Forum, Plumbers Forum.


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25