Welcome to UK Plumbers Forums Plumbing Forum


The UK's Biggest Plumbing Forum for DIY and Professional Plumbers; find


  •  » Plumbing Advice provided by Professional and DIY Plumbers alike
  •  » Customers can Find a Plumber, or Plumbers can Find Customers
  •  » Tips on Plumbing Tools, How-to Plumb, Plumbing Products etc
  •  » Advice and Discussion related to Tiling Courses and Plumbing Qualifications
  •  » Professional Plumbers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Plumbers are Welcome, For Gas only use Gas Safe Register Plumbers


Support by Plumbers, Manufacturers, Distributors and Plumbing Parts Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 13 of 13
Plumbing & Plumbers Forum - Back me up on this.
Like Tree7Likes
  • 2 Post By Kev the gas
  • 4 Post By tamz
  • 1 Post By GrahamM

Back me up on this.

Discuss Back me up on this. in the Gas Safe Register Forum - Public Forum at Plumbers Forums; Evening guys, I'm due to look at a job in London for a very high profile client (with royal connections) later this week. I have already been told that the ...
  1. #1
    New to Plumbing Forum HeatStar's Avatar
    Join Date
    Jun 2012
    Location
    Hemel Hempstead
    Posts
    25
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default Back me up on this.

    Evening guys,

    I'm due to look at a job in London for a very high profile client (with royal connections) later this week.

    I have already been told that the enormous property is heated by 3 boilers in total and has a host of gas fires and a cooker hob. They are proposing to add a fourth boiler (a combi) to enable the top floor living area to be fully independant. Now, all this adds up to a huge amount of KW of input would you agree? Apparantly the three boilers are 2 x Viesseman Vitodens 100W each with 26KW (fitted a year ago) and an old Kingfisher doing the hot water with max 19KW. This alone amounts to 71KW without taking into account the hob and fires and the proposal of a fourth boiler.

    What you may ask is supplying all these appliances with working pressure they need?... A single U6 meter with 22mm coming off and feeding throughout!

    Now, knowledge and maths tells me that these appliances are being starved of gas as a U6 meter can't cope with anything more than 64KW no? And thats not taking into account the undersized pipework (appliances are huge distances from meter).

    So, I know that when I visit the property it will be my duty to class the installation as I.D and seek permission to cap. But I'm really feeling a bit nervous about this as I know all eyes will be on me and my observations won't be met happily to say the least. I guess I'm just looking for a bit of confirmation and back up really. I know I am right (even rang gas safe tech to confirm) but just need a few more voices singing from the same sheet.


  2. #2
    Plumbers Arms member
    Kev the gas's Avatar
    Join Date
    Nov 2010
    Location
    West Sussex
    Posts
    600
    Thanks
    12
    Thanked 30 Times in 29 Posts

    Default Re: Back me up on this.

    The bigger the client the bigger the clout when you make a balls up.

    The appliances require a certain amount of gas, if you do not supply it you are last man on site.

    Walk away, show you have the balls, most clients will appreciate that and will trust you.

    If they wont listen to your advice now it is their loss.

    Kev.

  3. REDSAW and Masood like this.
    safe-gas-installer.co.uk

  4. #3
    New to Plumbing Forum HeatStar's Avatar
    Join Date
    Jun 2012
    Location
    Hemel Hempstead
    Posts
    25
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default Re: Back me up on this.

    My thoughts as to a solution at this point would be a bigger meter and complete new gas installation, but obviously I need to visit the property first to see that this is viable.

    I guess I just want to be able to state the facts and my duties and then propose a solution. I have heard that gas safe themselves will visit site free of charge to help spec a new install, but not sure if this is true?

  5. #4
    Plumbers Arms member
    Join Date
    Jun 2012
    Location
    London/Kent
    Posts
    1,723
    Thanks
    102
    Thanked 183 Times in 179 Posts

    Default Re: Back me up on this.

    Why would you want them on the job ?? You can & should be able to size it all up. When on site make sure you get down all the gas appliances kW inputs & a rough line lay out of the gas runs or what you think they are cor's you won't be able to see em. Take the info away & tell them you will have to size it all up & by the looks of it they are going to need an uprated meter. 71kw = around 6.6 M3/h Already over the U6 Qmax of 6M3/h.
    Last edited by chris watkins; 08-08-2012 at 08:34 AM.

  6. #5
    UK Plumbersforums Trusted Advisor.

    tamz's Avatar
    Join Date
    Apr 2010
    Location
    Scotland
    Posts
    9,384
    Thanks
    281
    Thanked 1,180 Times in 1,047 Posts

    Default Re: Back me up on this.

    The existing meter is well under without adding another boiler.
    You should mention this on your visit and tell the meter that is in is not big enough capacity for what is in, never mind adding another boiler and the pipework will need upgrading.
    It will need a U16 and the way you describe it, the pipework volume and possibly sizing, will be over domestic limits once altered so unless you have the tickets, you will need to sub it out.

    BTw regardless of who they are, you should treat every job the same.
    villa_tom, croppie, CES and 1 others like this.

  7. #6
    Top Plumbing Forum Contributor
    Join Date
    Feb 2011
    Posts
    666
    Thanks
    0
    Thanked 75 Times in 72 Posts

    Default Re: Back me up on this.

    You don't have to I.D the whole installation.
    You only need to cap off enough for the remainder to comply.
    Only you can see the installation but maybe just capping one of the Viesseman may be enough.

  8. #7
    Plumbers Arms member

    Join Date
    Apr 2010
    Posts
    1,399
    Thanks
    61
    Thanked 167 Times in 157 Posts

    Default Re: Back me up on this.

    To start with the instal is only ID if under-gassed and flame stability is affected or FGA readings way off. So you will need to do some testing.
    If flame stability and or FGA are acceptable and reaching MI's minimum rate, then it is an NCS situation if not getting full gas to reach max rate.
    If minimum rate not reached and flame stability/FGA are acceptable then it is AR.

    You may get away with AR, or as per snowhead if you have to ID, ask permission to disconnect an appliance to give you your minimum to the others.
    galaxy_plumbing likes this.

  9. The Following User Says Thank You to GrahamM For This Useful Post:

    Masood (09-08-2012)

  10. #8
    New to Plumbing Forum HeatStar's Avatar
    Join Date
    Jun 2012
    Location
    Hemel Hempstead
    Posts
    25
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default Re: Back me up on this.

    Thanks for the advice fellas, much appreciated. I'm aware I will have to carry out testing before classing anything, it just sounds to me that with all appliances operating they won't achieve their required working pressures and FGAs, but we'll see I guess.

  11. #9
    Plumbing Forum Contributor
    Join Date
    Dec 2011
    Posts
    54
    Thanks
    0
    Thanked 5 Times in 5 Posts

    Default Re: Back me up on this.

    Let us no how you get on.

  12. #10
    Plumbers Arms member

    Join Date
    Feb 2010
    Location
    Derby
    Posts
    349
    Thanks
    22
    Thanked 16 Times in 15 Posts

    Default Re: Back me up on this.

    Don't forget to include the diversity factor in you calculations

  13. #11
    stratobuddy
    Guest

    Default Re: Back me up on this.

    Don't forget when you speak to her, you call her MAM (rhymes with jam) not MAAM (rhymes with calm).

    "Your Maj" is a no-no.

  14. #12
    Plumbers Arms member

    Join Date
    Jan 2011
    Posts
    277
    Thanks
    30
    Thanked 18 Times in 18 Posts

    Default Re: Back me up on this.

    the diversity factor of the main boiler is 1 and i think the next boiler is as well but the third boiler is quite low poss .5 so be careful before rushing in kirk usually has these answers

  15. #13
    UK Plumbersforums Trusted Advisor.

    SafeGasInstall's Avatar
    Join Date
    Oct 2010
    Location
    Northampton
    Posts
    6,058
    Thanks
    595
    Thanked 290 Times in 280 Posts

    Default Re: Back me up on this.

    i did some work in a large house were they had 3 gas meters !!! so look around and just check to see what is there before you go and start mentioning cupping off the lot ! take it easy and give it all in writhing and suggest all that needs to be done to bring it to current standards .
    hope you get the job and give us a update how it went

Similar Threads

  1. Replies: 3
    Last Post: 09-01-2012, 07:00 PM
  2. Back to back toilets - solids transfering
    By roblindsey in forum Plumbing Forum
    Replies: 12
    Last Post: 09-06-2011, 10:38 PM
  3. back to it again
    By rod scarth in forum New Member Introductions
    Replies: 3
    Last Post: 19-01-2010, 12:16 PM
  4. acs back again
    By wnjswozo in forum Gas Safe Register Forum - Public Forum
    Replies: 10
    Last Post: 26-12-2009, 05:18 PM

Visitors found this page by searching for:

how to layout plumbing for viessemam

Tags for this Thread

Plumbers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.