Re: Tiling question
the cable shouldn't be a problem as their will be enough play in it.
the mains cold feed maybe if it comes out of the wall as this will more likely be secured in the wall. so not having any play in pipe.
the main trouble with electric showers fed from behind is they only have about 1" of pipe before an elbow into the shower fitting. so if you fit your tiles and that brings the wall out another 10-15mm on refitting the shower the pipe will be 10-15mm shallow.
and as stated in mi for electric showers they must be tiled behind not up to so they can breath.
i would tell him the problem and state its down to him to remove the shower and refit.
common sense it should of been done in two fits. but thats diyers for you. good luck.
|