View Single Post
Old 24-09-2007   #6 (permalink)
uug197h
Moderator
 
Join Date: Jun 2007
Posts: 364
View uug197h's Photo Album
Default Re: what qualifications???

6022 and 6032 takes about 3 weeks Fast track but non of the courses including 6129 cover every thing like showers and thats one big part to miss as everyone wants a shower the new showers have diverter valves and all the pipe work in in the wall so you have to be sure you dont get a leak most of the time the shower head is fitted after the walls are tiled the first time you do one you have bad dreams and wake up thinking you have a leak
uug197h is offline   Reply With Quote