View Single Post
Old 18-04-2008   #1 (permalink)
big al
Junior Member
 
Join Date: Apr 2008
Location: Hampshire
Posts: 7
View big al's Photo Album
Default thermostatic valves

having only recently completed C&G level 2, i have been asked to replace 6 valves on rads to thermostatic type. If i bung feed and expansion tank i know i can work on the system without having to drain it all one at a time. My query is wether i have to fill each rad seperatley and bleed it or can i change all valves and bleed them all after?

big al is offline   Reply With Quote