View Single Post
Old 06-04-2008   #1 (permalink)
Woody123
Junior Member
 
Join Date: Dec 2007
Posts: 14
View Woody123's Photo Album
Default Moving a radiator

I am planning on moving a radiator in my house, its only moving further along the wall as im having a new opening in the wall and where the new opening is going to be thats where the radiator is at the minute so need to shift along. First of all i need to cap it off can i just use pushfit cap ends? (this is while the building work gets done) Also when i extend the pipework under the floor boards can i just use plastic pipework instead of soldering it up? Or is it possible to use compression fittings underneath the floorboards or is this not allowed in the building regs?

Woody123 is offline   Reply With Quote